Blackwater Road at Knickerbocker Road

Last updated on March 20, 2024

Aerial view of Blackwater Road – May 2021

Open. The historic Knickerbocker Slide remains active and is affecting Blackwater Road.

Notice of Work

As a part of ongoing project planning, test pumping equipment continues to be monitored.

Location Map

Map showing slide area on Blackwater Road, located in western Quesnel, approximately 9 km from the city’s centre

Blackwater Road is located in western Quesnel, approximately 9 km from the city’s centre.


Status

Blackwater Road is currently open, despite damage caused by the Knickerbocker Slide. The scope of the Blackwater Road project includes realignment and reinforcement of the road, plus mitigation measures intended to help prevent future landslides in the project area.

The project team undertook work to determine a safe and climate resilient solution, which included:

  • Options development, which includes investigations on soil and water
  • Environmental reviews and on-site inspections
  • Interim drainage and slope improvements

Traffic impacts

Notification of project-related fieldwork or construction is posted on this page in advance. For the latest information on road conditions, please visit DriveBC.

Timeline

We will have more information on timelines when our technical work is complete.

Public engagement

An information session was held in Quesnel on November 9, 2023 regarding the Blackwater Road at Knickerbocker Road project.

You can share your feedback with the project manager. Use the subscribe feature to be informed of opportunities for public engagement and updates to this page. 

Archive

 

Progress Updates

Notice of Work – Summer 2023
As a part of ongoing project planning, work was undertaken on Blackwater Road. Crews were on site monitoring test pumping equipment and undertaking environmental and geotechnical investigations, including collecting soil and water samples, to inform the project design.

May/June 2023
Crews installed and connected subsurface instrumentation for test pumping, including cables and a hydro pole, for a pilot dewatering system that will inform project design. This work began on May 29 for approximately one month.

March 2022 
An online engagement period was held to introduce the Cariboo Road Recovery Projects and gather feedback.

February 2022 
Monitoring stations were installed, allowing for further reconnaissance as long-term options are developed.

November 2021
An in-person drop-in session at Kersley Hall was held to provide updates on the Blackwater Road at Knickerbocker Hill Project. 

Fall 2021 
Temporary resurfacing of Blackwater Road was completed to improve rideability for road users.

2020/2021
The Knickerbocker Slide caused distortions to the surface of Blackwater Road.

 