Project No. 26243-0001

Last updated on May 29, 2024

Highway No. 97 Cottonwood Hill Phase 2 


Submission for Tenders Expires: June 12, 2024

Project Number: 26243-0001

Contract ID: 26243MJ0001

Location: The Site is located on Highway No. 97 in the North Cariboo Service Area approximately 14 km north of the City of Quesnel within LKI Segment 1151 from km 13.91 to km 15.28.

Description: The general nature of the Work to be carried out under this Contract consists of the realignment and reconstruction of 1.37km of Highway 97, and the unloading of crest of the Cottonwood Slide through excavation adjacent to the highway. The Work involves most common aspects of highway construction, as well as, without limitation, the following complex or unusual aspects; Coordination with CN Railway for construction on railway right of way; and Geotechnical monitoring of an active slide area.

 

Document
Number

Document Description

1

Project No. 26243-0001 - Cross Sections

2

Project 26243-0001 - Construction Tender Data Package

3

Construction Staging Drawings

4

Cottonwood River Slide 2021–2022 Geotechnical Data Report – BGC Engineering, Nov. 2023

5

Cottonwood River Slide Geotechnical Design Report – BGC Engineering, Mar. 2024 

6

Cottonwood River Slide 2023 Geotechnical Data Report – BGC Engineering, Mar. 2024 

7 Environmental Report: Technical Memo Phase 2: Highway 97 Cottonwood Slide Project, Quesnel BC – McElhanney, Jan. 2024
8 Cottonwood Hill Slope Stabilization Project – Drainage Report – McElhanney, Feb. 2024
9 Technical Memo – Cottonwood Hill Slope Stabilization Project – Temporary Drainage Recommendations – McElhanney, Mar. 2024
10 Removal of Existing Survey Monitoring Structure (Photos)
11 Quesnel Project Office Trailer
12 Tremblay Pit Technical Information Report Dec 2023
13 Tremblay Pi Location Plan 1
14 Tremblay Pit Location 2
15 2121-00924-00 Cottonwood Step A Report rev 1 signed
16 26243-en-mem-stepa-20240223-0
17 Final – Cottonwood River Slide - Phase 2 Updated Embankment Widening Stability Assessment
18 Final – Cottonwood River Slide - Geotechnical Data Report Q1 2024 Site Investigation
19 Final – Cottonwood River Slide – Instrumentation Reading Summary
20 Draft – North Slide Stability Assessment
21 Draft – Cottonwood River Slide – Phase 2 Umiti Pit Stockpile – Geotechnical Assessment